06 Nov Offshore Sonic / Geobor-S / CPT
Despite the challenges of working offshore there are occasions where the weather does give us a break and provide a skyline such as this. This photo, provided by our Lead Driller Paul Jeans was taken on the Apollo JUP where GeoSonic Drilling have been continuing with extensive drilling works since September. Using combined methods of CPT, Sonic and Geobor-S our drill crews have been working hard to advance positions through marine deposits and underlying bedrock of sandstone, mudstone and limestone to depths >100m from JUP level.
Sorry, the comment form is closed at this time.