Uncategorized

Through 2022 GeoSonic Drilling completed a sonic drilling campaign as part of an ongoing geotechnical investigation on a large tailings storage facility at Boliden Aitik, Sweden’s largest open-pit copper mine. Working with Boliden, Klohn Crippen Berger, ConeTec and Cambridge Insitu Ltd, the drilling campaign encompassed sonic drilling and sampling...

Another rig loaded and ready to hit the road to undertake some extensive aggregate sampling over the next few months. Our crews have been working hard as usual over the length and breadth of the UK, Ireland, France and the high latitudes of Sweden demonstrating...

Extreme temperatures call for extreme measures. From the searing heat of the Arabian peninsula to the frozen tundra of deepest Siberia, GeoSonic’s rigs and crews have successful experience in temperatures ranging from -50C to +50C. GeoSonic rigs bring benefits to your mining project whether it be exploration,...

GeoSonic Drilling have been proudly supporting the British Geological Survey in recent weeks through provision of drilling staff to aid operation of their Remote Seabed Drill unit in the North Sea. A team of two drillers from GeoSonic worked on board the Research Vessel Maria...

Depths 0 to 80m – Mini Sonic 0 to 200m – Full Size Sonic Core barrel diameters – Nominal I.D 95mm, 97mm, 125mm & 185mm Semi-rigid plastic liners are available for 95mm core barrel to give an 85mm sonic core sample Core barrels lengths 1m, 1.5m and...